Overview
This is a complete step by step and detailed guide to get your satsuma up and running quickly, i have included all nut/bolt sizes and quantities as you follow the videos, I hope this helps, any feedback would be great, thanks :)★PLEASE RATE IT UP★
Parts/Items you will need to buy at the store
This is a list of the minimal quantities you will need in order to complete the satsuma build
1. 1x Fan belt
2. 1x Bottle of oil
3. 1x Bottle of Coolant
4. 3x Bottles of Brake fluid
5. Also you may want to fill the gas can, as you dont start with much (mistake i made)
Stage 1 – Rolling chassis – 1/4
Stage 2 – Engine build/install – 2/4
Stage 3 – Running gear – 3/4
Stage 4 – Interior and Exterior 4/4
Stage 5 – Filling the fluids and FIRST TIME START UP
New coat of paint and licensed 🙂
After a trip to fleetari’s i now have the roll cage fitted 🙂
Stage 6 – From road to rally ready Part 1
Stage 7 – From road to rally ready Part 2
Im ready for the rally……
After buying a custom paint job, i am now ready 🙂